The heavy-lift transport system that will haul the pre-assembled bridge down SEA’s center runway on the night of Jan. 23 for installation at the main terminal.
The heavy-lift transport system that will haul the pre-assembled bridge down SEA’s center runway on the night of Jan. 23 for installation at the main terminal.