Browsing Tag: Boeing 787 Dreamliner

It was not surprising that it was raining in Seattle as Qatar's first 787 left Boeing Field. Photo by Mal Muir / AirlineReporter.com.

It was not surprising that it was raining in Seattle as Qatar’s first 787 left Boeing Field. Photo by Mal Muir / AirlineReporter.com.

This multi-part (PART 1) series was written by AirlineReporter.com correspondent Mal Muir (note: Qatar Airways covered Malcolm’s trip to Doha to cover this story).

It’s grey outside, rain clouds threaten and there is a chill in the air (substantial for this Aussie implant to the USA) to warrant a scarf.  I don my properly-themed Boeing scarf and head out into the morning air of this Seattle fall day.  The weather cannot dampen my mood, nothing (apart from an inherent lack of coffee) can do that right now. I am about to hitch a ride on a 787 Dreamliner.

Tuesday the 13th of November 2012 is the day that Qatar Airways made their first 787 delivery flight.  As we departed downtown for Boeing Field (BFI) we were all excited and restless. Our departure was delayed and this was making some people antsy, but our arrival time to Doha, Qatar had not changed.

Qatar Airways Boeing 787 Business Class seat. Photo: Mal Muir / AirlineReporter.com.

Qatar Airways Boeing 787 Business Class seat. Photo: Mal Muir / AirlineReporter.com.

The flight ,QR3787, was to happen on-board A7-BCB, the first Qatar Airways 787. We were set to fly the approximately 7500 miles direct to Doha with only about 90 people on-board, including a mixture of Qatar Airways staff, Boeing staff, contractors (such as Thales, Recaro, OnAir and BE Aerospace) and invited guests & media (the category I fell under).

I was lucky enough to be assigned a Business Class seat (4K), but with only 22 premium seats up front, the remainder of the passengers had to sit in economy. Do not feel too bad for them, each got a full row to themselves and received Business Class level of service.

Although most non-737 delivery flights happen at Paine Field (in Everett), our flight was departing from Boeing Field, just south of downtown Seattle.  I assume this was done since LOT Polish Airlines was taking delivery of their first Dreamliner at Paine on the same day.

A souvenier Qatar Airways Boeing 787 key for invited guests. Image: Mal Muir / AirlineReporter.com.

A souvenir Qatar Airways Boeing 787 key for invited guests. Image: Mal Muir / AirlineReporter.com.

Before boarding, there was no big TSA-style security; although laptops and liquids could stay in, my belt and shoes could not. It was a quick and visually appealing drive along the Boeing Field ramp past rows of 737s before arriving at the 787.  As we approached the aircraft, the excitement got the better of me and I was stunned that I was about to set foot on-board my first 787 flight (although I had previously been on United’s 787). If my excitement wasn’t high enough already,  I was handed a souvenir key by Boeing staff at the bottom of the stairs, marking the delivery.

On-board was a mix of people taking photos, mingling with the staff and the crew and just starting to relax into what would be a fantastic journey.  I had a quick chat with the Captain in charge of the flight, and learned that the day would also mark the line check of the first Qatar Airways 787 pilot. Qatar and Boeing pilots would take turns at the controls of the plane and I was interested in knowing where the crew was planning to rest between shifts.

Even in a 9-abreast configuration, economy did not look too shaby. Although, I was happy I had a business class seat. Image: Mal Muri / AirlineReporter.com.

Even in a 9-abreast configuration, economy did not look too shabby. Although, I was happy I had a business class seat. Image: Mal Muri / AirlineReporter.com.

Qatar designed this variant of their 787s with mid haul flights in mind (flights of 5-7 hours) so there is no crew rest facilities on-board, which have been seen on other Dreamliners.  We were looking at a 12-14 hour flight ahead of us (ultra long haul), so how would they rest?  The Qatar Captain revealed that a portion of the Economy Cabin was set aside for the cabin crew and 2 business class seats had been set aside for the flight crew.

Soon enough, the door was closed, an announcement was made and we all had to take our seats. As we were about to push back from our parking bay, a United 787 pulled in right next to us as almost to wish us well on our journey.

We taxied to the end of 13R, the two GENx engines spooled up and we were on our way. The engines did not seem to have the force of the GE90, but they were much quieter and were able to easily get us off the ground.  Being airborne in the 787 for the first time was surreal. Seeing just how far that composite wing flexes once airborne was a little bit crazy, at one point it seemed it was higher than the aircraft itself. A true work of engineering art.

We climbed out towards the south before turning to track north and on our polar route towards the middle east. Soon the seat belt sign came off and we were free to roam the cabin.

YAY! The first 787 Dreamliner delivered with Wi-Fi ready to go. Image: Mal Muir / AirlineReporter.com.

YAY! The first 787 Dreamliner delivered with Wi-Fi ready to go. Image: Mal Muir / AirlineReporter.com.

Qatar selected OnAir to provide on-board Wifi and GSM services on their new 787s.  Although a little slow to start (as I’m sure it was due to everyone hammering it at the same time to connect and be the first to say ’œI’m on-board’) the service was pretty consistent. One down fall is you couldn’t have more than one device connected to a single account at any time. This was probably more of an issue during a media event than it would be for a normally scheduled flight.

Without even realizing it, we were almost 90 minutes into the flight before the lunch service began, but to be honest, I had not even noticed.  This seemed to be the whole feeling on the flight; time moved quickly.

A successful airline is much more than just a seat and food. It is about the people. Image: Mal Muir / AirlineReporter.com.

A successful airline is much more than just a seat and food. It is about the people. Image: Mal Muir / AirlineReporter.com.

The CEO of Qatar Airways, Akbar Al Baker, previously stated that, ’œBusiness Class is the new First Class.’ This was definitely true with amenities provided from Salvatore Ferragamo including slippers, an amenity kit (in a stylish pouch) and even pajamas.  This 5 star service (Qatar Airways continues to win many different awards) continued with the menu for lunch being a 5 course, individually plated affair of a mixture of traditional Arabic meals with a mixture of Western and Indian options.

The meal time was also the first chance I got to fully play with the new state of the art Thales IFE system.  Touted as cutting edge, this system had what was described as two screens at each seat.  The main screen in Business Class is a large 15’ LCD with the second screen being the remote itself. The system is android based so the remote is a touch panel and allows you to be able to navigate menus and edit playlists, all without interrupting the current selection that you have playing on the main screen.

It even had the ability to display a full moving map display on the remote while the main screen was playing a movie. That’s how I knew we were currently somewhere over Canada as I was watching The Dark Knight Rises while enjoying the 5 course meal’¦ that’s the way to fly right?

Two screens are better than one right? IFE in economy. Image: Mal Muir / AirlineReporter.com.

Two screens are better than one right? IFE in economy. Image: Mal Muir / AirlineReporter.com.

After the filling meal, most people started changing their seat into sleep mode and the crew blacked out all the cabin windows.  The cabin became very quiet now as it seemed to be a little bit more quieter compared to a 777 or 747, though not upper-deck on an A380 quiet. I was hoping to catch some sleep, but with all the distractions and excitement, I knew that might have been difficult.

Continue reading with PART 3 of this story…

This story written by…Malcolm Muir, Lead Correspondent. Mal is an Australian Avgeek now living and working in Seattle. With a passion for aircraft photography, traveling and the fun that combining the two can bring. Insights into the aviation world with a bit of a perspective thanks to working in the travel industry.

@BigMalX | BigMal’s World | Photos

Qatar's first Boeing 787 Dreamliner at BFI. Photo by Mal Muir / AirlineReporter.com.

Qatar’s first Boeing 787 Dreamliner at BFI. Photo by Mal Muir / AirlineReporter.com.

This multi-part series was written by AirlineReporter.com correspondent Mal Muir (note: Qatar Airways paid for Mal’s trip to Doha).

On Monday the 12th of November 2012, Qatar Airways took delivery of their first Boeing 787 Dreamliner at a special ceremony at Boeing Field (BFI) in Seattle.  Held in the 3-390 Hangar at Boeing Field the event was an extravagant ceremony for an airline that has one of the youngest and most technically advanced fleets in the world.

The event began with a mystery arrival into the hangar where an Arabian style oasis could be found as guests mingled and waited for the main event.  A press conference was held at the ceremony by not only Boeing and Qatar Airways but also the Ambassador to Qatar.

The decorations in Seattle for the delivery ceremony.

The decorations in Seattle for the delivery ceremony. Photo by Mal Muir / AirlineReporter.com.

Mr. Akbar Al Baker, the CEO of Qatar Airways, heralded this momentous event while being bombarded by questions from the global media including Flightglobal, Aviation Week, USA Today, Al Jazeera, and also the local news media as well such as King 5 News Seattle (and of course a select few web bloggers).  With financial delivery having being made a week or so earlier (as evidenced by flight QR999 from Everett to Victorville to continue its fit out) rather than the usual signing of paperwork a short gift swapping ceremony was completed to signify the handover of the aircraft.

With the press conference completed a short Promotion Video put together by Qatar Airways to show off their 787 was shown before the big moment. A white sheet was lowered and there standing proud behind it was A7-BCB, the first Qatar Airways 787.  After a quick ribbon cutting ceremony by the dignitaries, we were invited on-board and it was like a being a kid in a candy store.

The economy class of Qatar's Boeing 787 Dreamliner.

The economy class of Qatar’s Boeing 787 Dreamliner.

Everyone swarmed the aircraft, trying out the seats, seeing the larger windows evident on all 787 aircraft and anticipating the first flight the next day.  The 787 configured for a longer haul routes was a sight to behold.  Cutting edge In-Flight Entertainment (IFE), new tailor made and designed seats by Recaro and the latest in Wi-Fi connectivity by OnAir, the shiny new airplane just screamed out to everyone.

With thousands of photos taken of both the interior, exterior, candid shots, poses by media, special guests, staff who built the aircraft, we were all back on the buses for the delivery dinner.  Heading away from Boeing Field (soon to return though) and heading for Seattle Center and Chihuly Gardens.

The delivery dinner was held at the Chihuly Garden and Glass in the shadow of the Space Needle. Photo by Mal Muir / AirlineReporter.com.

The delivery dinner was held at the Chihuly Garden and Glass in the shadow of the Space Needle. Photo by Mal Muir / AirlineReporter.com.

The dinner was a relaxed, fine evening with a menu that was focused on local, seasonal produce, plenty of fine wine and drinks and some relaxing and mingling by the guests.  This was the culmination of so much hard work and effort by so many people who worked tirelessly to get to this day that they were all in the mood to celebrate and honor as well some of those who made huge efforts into getting this aircraft to this point.

The night drew to a close with many tired heads as we were bussed back to respective hotels. The journey was only just beginning for me, but for some, tomorrow would show the end of a journey that had begun five years earlier when Qatar Airways signed the contract for their first of 60 787s.

Stay tuned for the rest of Malcolm’s adventure as he flies in Business Class on Qatar Airway’s first 787 Dreamliner to Doha.

This story written by…Malcolm Muir, Lead Correspondent. Mal is an Australian Avgeek now living and working in Seattle. With a passion for aircraft photography, traveling and the fun that combining the two can bring. Insights into the aviation world with a bit of a perspective thanks to working in the travel industry.

@BigMalX | BigMal’s World | Photos

Celebrating the official handover to Qatar Airways of its first 787 Dreamliner in Seattle are, from right: Qatar's Ambassador to the United States, His Excellency Mohammed Bin Abdulla Al-Rumaihi; Qatar Airways CEO Akbar Al Baker; and Boeing Commercial President and CEO Ray Conner. Photo from Qatar Airways.

Celebrating the official handover to Qatar Airways of its first 787 Dreamliner in Seattle are, from right: Qatar’s Ambassador to the United States, His Excellency Mohammed Bin Abdulla Al-Rumaihi; Qatar Airways CEO Akbar Al Baker; and Boeing Commercial President and CEO Ray Conner. Photo from Qatar Airways.

Last night, Qatar Airways officially took delivery of their first Boeing 787 Dreamliner and are scheduled to fly the aircraft to Doha at about 1:10pm PST today from Boeing Field (BFI).

Follow along with Malcolm Muir (@bigmalx), AirlineReporter.com Correspondent, as he takes the 13.5 flight. The beauty is that their 787 is already configured with WiFi from OnAir, so experience the flight live via Malcolm’s Twitter, on FlightAware.com and the #Qatar787 hashtag.

BONUS: My Qatar Airways Boeing 787 Dreamliner Interior Tour at Farnborough

Over the next few months Qatar Airways will launch 787 service on a number of new routes, including Belgrade, Serbia (November 20); Warsaw, Poland (December 5), Gassim, Saudi Arabia (7 January 2013); Najaf, Iraq (January 23); Phnom Penh, Cambodia (February 20); Chicago, USA (April 10); and Salalah, Oman (May 22).

Qatar Airways is the first middle east airline to take delivery of the 787.

United's first Boeing 787 Dreamliner in Houston. Image by Chris Sloan / Airchive.com.

United Airline’s first Boeing 787 Dreamliner in Houston. Image by Chris Sloan / Airchive.com.

Chris Sloan, the man behind Airchive.com and is Executive Producer and Creator of Airport 24/7, was able to take the inaugural flight of United Airline’s first Boeing 787 Dreamliner. He agreed to share some of his photos and story with me and the rest of his story will be showing up on Airways Magazine in their February 2013 issues, hitting the shelves January 2nd. Here is his story, in his own words:

It is 5:00AM the morning of Sunday November 2, 2012 as I make my way over to Gate E5 at Houston’s George Bush Intercontinental Airport from a very quiet ticket counter, save for some journalists including Airways Magazine correspondent and director of social media, extraordinaire Jack Harty.

Despite the obscenely early hour, Jack and I are absolutely pumped with excitement and anticipation covering the story via live tweets, blogs, and for ’œAirways’. After foregoing a major development event, there is concern that this launch might be devoid of much of the pomp and circumstance of other launch flights, but this lack of showmanship, but this is doing little to dampen our enthusiasm for the inauguration of the first Boeing 787 to be operated by a U.S. carrier.

United's CEO, Jeff Sismeck and flight crew stand on stage. Image by Chris Sloan / Airchive.com

United’s CEO, Jeff Sismeck and flight crew stand on stage. Image by Chris Sloan / Airchive.com

On an optimistic note, Jeff Smisek, United’s President and CEO main theme is ’œThe 787 is worth the wait and all of our guests and members of the press are about to find out why’. Beyond all the usual groundbreaking features of the 787 normally mentioned: efficiency, pressurization, large windows, LED lighting, clean air, gust suppression technology, the humidified cabin, the ultra-quiet flight experience; Smisek gets some laughs when he says that ’œyou will all be very impressed with the lavatories’.

After the ribbon is cut, the boarding of the approximately 200 passengers begins promptly at 6:50AM. Flight 1116 from IAH-ORD is a normal operating flight with mostly paying passengers, some press, United high status customers, and of course a number of aviation enthusiasts. Many passengers are completely, but pleasantly surprised at the significance of this morning’s flight.

There have been many ribbons cut in the history of airline travel and this even was no different. Image by Chris Sloan / Airchive.com.

There have been many ribbons cut in the history of airline travel and this even was no different. Image by Chris Sloan / Airchive.com.

My first impressions of the cabin are positive. Though lacking the bar entry way of other airline’s 787, the entry through the gallery is still a major improvement over other aircraft, particularly with United’s blue LED boarding lighting program. I settled into my spacious seat, 6A in United BusinessFirst.

United initially chose to go big with a remarkable 8 flights scheduled on Day One involving 5 of United’s hubs: Houston Intercontinental, Newark, Chicago O’Hare, San Francisco, and Los Angles. These flights were to use 2 aircraft from the 787’s Houston base. United’s plan was to temporarily rotate the 787-8 through all of its domestic hubs that have a widebody service with domestic promotional and familiarization flights before it shifts to international operations on December 4th.

The journey to this day has been over 8 years in the making. United merger partner, Continental was the first airline in the America to placed an order for the Dreamliner shortly after the airliner was first offered to the market. Continental ordered 10 787-8s powered by the GEnx-1B.

The entry way in United's 787 is not as impressive as other 787's, but nice none-the-less. Image by Chris Sloan / Airchive.com

The entry way in United’s 787 is not as impressive as other 787’s, but nice none-the-less. Image by Chris Sloan / Airchive.com

The 787 would never fly under the Continental brand as United and Continental announced their merger in May 2010 and operationally on March 1, 2012. As everyone knows, the Continental Globe logo would carryover in the merger, replacing the tulip-a visual nod that this was in fact a merger of equals.

Ian Hankin, the Principal Engineer in Product Engineering points out in United PR releases that ’œgetting the 787 ready for regular operations has been more complex than for any plane to date, and the checklist of tasks runs many pages long. The different sections of the checklist correlate with various divisions throughout the company’. Hankin says ’œThis is due, in large part, to the advanced technology that makes up the plane’s structure (50 percent of which is composite materials) and the interior unique features.’

United's BusinessFirst seats on the 787 Dreamliner. Image by Chris Sloan / Airchive.com.

United’s BusinessFirst seats on the 787 Dreamliner. Image by Chris Sloan / Airchive.com.

United’s new BusinessFirst Cabin was initially to debut on the 787, but due to the delivery delays; it debuted on the 767 instead. It also does not feature the ’˜Dome’ dramatic entrance of some other airline’s 787s at door no. 2. Passengers enter through the galleys. Other than that, all the other Dreamliner features remain in place: the electronic dimmer buttons for the massive windows, high-arched ceiling, dynamic LED lighting, and enhanced ventilation and pressurization systems.

United’s 787 is configured with 36 seats in Business First 2-2-2 abreast with 60’ of pitch and 22’ in width. United has chosen a tighter seating layout then some 787 operators such as ANA and JAL opting for a 9 seats abreast in the economy cabins: 72 Economy Plus with 35-36’ of pitch and 18.3’ in width in a 3-3-3 abreast configuration, and 113 seats in Economy with 31’ pitch. On the return flight by the way, I sampled Premium Economy and was pleasantly surprised at how roomy it was. Panasonic’s eX2 provides the in-seat in-flight entertainment system on United’s 787 with Audio-Video on demand available at each seat. Power outlets are located at each seat in the business-class cabin and there are two for every three seats in the main cabin except for in the bulkhead rows where there are three outlets. Wi-Fi is not yet certified for the 787s. United is certainly not happy that their new flagship doesn’t have this capability, nor does any other 787 at this moment.

Economy is set up in a 3-3-3 format in United's 787s. Image by Chris Sloan / Airchive.com.

Economy is set up in a 3-3-3 format in United’s 787s. Image by Chris Sloan / Airchive.com.

According to the reservation agent, I was the first person to purchase a ticket on the first flight of Dreamliner service, the flight we are on today: United 1116. There was a lot of debate by #AvGeeks in the blogosphere and Twittersphere on whether this and the other November 4th flights would in fact be the first flights, or whether there would be special flights earlier. Even United’s press releases hinted at this possibility.

Unlike other airlines who chose splashy delivery ceremonies, United took delivery of their first 787 in a low-key manner on Sunday September 23rd. Rumors again swirled throughout the AvGeek world as to when the actual delivery would be and if there would be a large event. In the end, United chose to deliver their first 787 on Friday September 28, 011 from Boeing Field, instead of the usual Paine Field, as flight 7708 operating to Houston. There would be no fanfare upon departure. With 787 Fleet Standards Manager Captain Dave Lundy and Boeing 787 Assistant Fleet Manager Niels Olufsen at the controls, the journey between Seattle and Houston took approximately four hours departing at 9:56AM PST and landing at IAH at 3:56PM CST at an altitude of 41,000 feet. Upon arrival into United’s hub at stormy Houston George Bush Intercontinental Airport, the 787 was greeted by a water cannon salute before taxiing over to a hanger with excited employees waiting for it.

The LED lighting really sets the mood on the 787 Dreamliner. Image by Chris Sloan / Airchive.com.

The LED lighting really sets the mood on the 787 Dreamliner. Image by Chris Sloan / Airchive.com.

This morning, Sunday November 4th there, are 4 flights operating the inaugural day: Our flight, 1116, is the first scheduled to depart early at 7:20AM with an arrival into Chicago O’Hare’s at 9:51AM. This plane is scheduled to turn-around and return back to Houston as flight 1510 after less than 2 hours on the ground in Chicago. Originally there were 8 flights scheduled, but now just 4. The remaining 2 flights of the day are: Houston-Los Angeles-Houston (IAH-LAX-IAH). United hubs at LAX, Newark, Cleveland, Denver, and Washington Dulles were scheduled to join the 787 Hub Tour throughout the month depending on the timing of the 2nd 787 being ready, with domestic revenue and familiarization flights continuing into early 2013.

We taxied out to IAH Runway 9, and at 7:27AM CST, began our very quick and very quiet 27-second take-off roll. With the aircraft only weighing 375,000 pounds (with 55,000 pounds of payload) out of a possible 502,000-pound max weight, Vr came at 140 knots in what was obviously a whisper-quiet take-off roll. A few seconds later we were airborne in a Northeastly direction to another round of applause, as is de rigueur in these occasions. We encountered a little chop in the climb to our FL41 cruising altitude, which gave a nice demonstration of the 787’s active aileron-driven gust suppression. The 787 is noticeably smoother than aircraft of its similar size such as the 767 and A330. Captain Starley came on the PA with some facts about the Dreamliner and today’s 2 hr, 9 min flight which would take us over to the east of Dallas, TX; Tulsa, OK; Springfield, MO; north of St. Louis, Joliet Illinois right into Chicago. We would fly at 504 knots and 580 mph. 19 minutes after take-off we leveled off at 41,000 feet.

Lighting really provides a nice atmosphere in United's 787 cabin. Image by Chris Sloan / Airchive.com.

Lighting really provides a nice atmosphere in United’s 787 cabin. Image by Chris Sloan / Airchive.com.

At 7:54AM, United CEO Jeff Smisek came up from the back (yes, he was seated in Economy) and led a champagne toast, which was met with cheers. The seatbelt sign came-off briefly, albeit as the crew began their service. The LED lighting changed from the light blue cruising hue to a warm orange-ish tone, which supposedly accentuates the appearance of food. Apart from the commemorative Dreamliner souvenirs, first flight certificates, and cute custom 787 cookies, the service was fairly normal. In Business Class, we were offered tasty Egg McMuffins or cereal with fruit, yogurt, and croissants. In Economy, Buy-on-board meals were offered. The 8 Flight Attendants (11 FA’s are on international flights) who had specially bid this trip conducted a gracious, proud service while navigating around what had turned into an airborne party.

After a quick breakfast, I had an opportunity to checkout the comfortable new lie-flat seats that were very comfortable and a big improvement over the previous BusinessFirst product. If there is any complaint, it’s that the AC power and USB connections are located rather inconveniently behind the passenger at the back of the seat. The Panasonic eX2 in-flight-entertainment system is chock-a-block full of music and video on demand, games, and a high-resolution airshow moving map, but sadly United’s famous ’œChannel 9’ for listening to the pilot’s communications is missing. The IFE, while excellent, isn’t as cutting edge as some other’s but in United’s defense, it was state-of-the-art when initially ordered. My favorite, and previously unreported feature, was the smartly lit buffet / bar at the front of the forward BusinessFirst cabin. United’s seems somehow aesthetically better designed and more properly scaled than the ’œgalley bars’ on other 787s.

BusinessFirst seats in United's Boeing 787 Dreamliner. Image by Chris Sloan / Airchive.com

BusinessFirst seats in United’s Boeing 787 Dreamliner. Image by Chris Sloan / Airchive.com

With 40 minutes left in the flight, the air brakes came up and we began our initial descent. Captain Starley announced that we were burning an astoundingly low 9,000 pounds of fuel per hour, and that with 55 mph of tailwind were now flying at Mach .833. He termed the 787 as ’œa generational step forward’, yet ’œIt still flies like a Boeing and it’s a ’˜pilot’s airplane’’. Starley, who has flown commercially since 1973 and has flown everything from DC-8s to 777s, has the experience for his perspective to matter. Later to me, He offered that the 787s enhanced fuel efficiency is not only good for the environment and passengers, but it also equals job security for airline jobs as it allows airlines to fly more profitably at lower costs.

Captain Starley turned the 787 auto-pilot off at 4,000 feet and at 9:36AM CST executed a perfect ’œgrease job’ of a landing onto ORD’s runway 10, to cheers and clapping. We quickly exited the runway and as we taxied the first words heard over the PA, were ’œIt’s A Dream Come True’, and yes you guessed it: there was more applause. What’s an inaugural flight without the obligatory Grand Finale: ’œThe Water Cannon Salute’. These salutatory moments never get old as our 787 was given a bath from both sides of the jet. At United’s Gate C20, I deplaned right behind Jeff Smisek to a line of well-wishers and press. His remarks said it all: ’œAwesome! Just Awesome!’

United's first two 787's at IAH. Photo by Chris Sloan / Airchive.com.

United’s first two 787’s at IAH. Photo by Chris Sloan / Airchive.com.

After a short gate ceremony, United flight 1510 boarded for its on-time departure to Houston. This more subdued and conventional flight would be nearly devoid of all the ceremony of the inaugural flight. In fact, apart from being on the newest airliner of the 21st Century, it felt utterly normal. The Dream had become reality and that was the point.

See many more photos of Chris’ adventure on United’s 787 on his site Airchive.com.

A model of the Boeing 787 outside the Visitor Center in South Carolina.

A model of the Boeing 787 outside the Visitor Center in South Carolina. Check out the wing-like roof.

This is a guest post written by Drew Vane for AirlineReporter.com:

I recently visited a Boeing Factory. No, I’m not talking about Renton or Everett, but in South Carolina.

Covering almost 11 football fields and completed in mid 2011, Boeing’s ’œother’ factory for manufacturing the new 787 Dreamliner is located in North Charleston, South Carolina on property bordering Charleston International Airport and Joint Base Charleston.  I had the opportunity to stop by during a business trip recently and let me tell you, this facility is impressive.  According to Boeing’s web site, ’œBoeing South Carolina fabricates, assembles and installs systems for aft (rear) fuselage sections of the 787 Dreamliner and joins and integrates mid-body sections from other partners.’

These partners include companies located in India and Japan.  While I wasn’t able to tour the facility during my trip, I did take a short visit to the visitor’s facility and grabbed some pics of the lineup near the fence line.  I just happened to miss the second 787 Dreamliner to depart for India by only one day.  I also missed the departure of the Dreamlifter with its precious cargo bound for Seattle, but I hope to catch one in the future.

Some 787s on the tarmac at Boeing's South Carolina facility. Image by Drew Vane.

Some 787s on the tarmac at Boeing’s South Carolina facility. Image by Drew Vane.

Since green is the name of the game these days, Boeing designed this facility to be as environmentally friendly as possible.  The final assembly building was fitted with solar panels that are capable of generating enough electricity to power 250 homes with a peak energy output equal to 200,000 13-watt watt bulbs.  In addition, Boeing has a zero waste program where recycling and reuse is the norm, creating zero waste to landfills from the facility as a whole.  Quite impressive for such a large manufacturing facility.

The visitor’s center unfortunately is for those with permission to enter the site.  I had hoped to see a retail store, room full of Boeing paraphernalia and models for sale.  It is too bad that the store is behind the fence, far from public eyes. The visitor center is more a front gate for those seeking security badges or meeting Boeing employees.  They did have a very nice facility with a roof in the form of a 400-ft long wing, an outside small display with the history of Boeing, and a large scale model of the 787.

Boeing workers who built the facility

Boeing workers who built the facility

A very courteous Boeing employee was kind enough to talk with me as he was leaving for the day.  Boeing’s Charleston facility is the only location currently in the world where the 787 tail assembly is manufactured.  Boeing ships the tails to Everett where they’re assembled. Similar to Everett, all the parts are shipped here to Charleston for assembly.  At the present time, Boeing’s manufacturing is only capable of producing one 787 per month.  But, they hope to eventually ramp that up to one every six days, similar to the Everett Washington facility.

From public areas, I did spot some red tails (not the movie) in the lineup area and took a drive over, stopping outside the fence to snap a pic of the lineup.  What an impressive sight!  I was excited just to be in the same state as these fine aircraft. I cannot wait until my next visit.